Sydney 3 5152GH Drunen

(July 12, 2025)

General Information

Registration Date: July 12, 2025

Survey Date: July 11, 2025

Valid Until: July 11, 2035

Certificate Holder: Jobse Groep B.V.

Survey Type: Basisopname

Status: Bestaand

Calculation Type: NTA 8800:2024 (basisopname woningbouw)

Based on reference building: -

SBI Code: -

Project Name: -

Project Object: -

Building Information

Building Type: Rijwoning tussen

Building Subtype: -

Building Class: W

Construction Year: 2009

Thermal Zone Area: 129.51 m2

Compactness: 2.06

Energy Performance

Energy Class: A

Energy Index: -

Energy Need: 97.62 kWh/m².yr (EP1)

Primary Fossil Energy: 148.32 kWh/m².yr (EP2)

Renewable Energy Share: 0.0 % (EP3)

Temperature Exceedance: 2.69

Heat Demand: 94.64 kWh/m².yr

Energy Index (EMG Forfaitair): -

Primary Fossil Energy (EMG Forfaitair): None

Renewable Energy Share (EMG Forfaitair): -%

Energy Need Requirement: - kWh/m².yr (BENG1)

Primary Fossil Energy Requirement: - kWh/m².yr (BENG2)

Renewable Energy Share Requirement: - % (BENG3)

Temperature Exceedance Requirement: -

Calculated CO2 Emission: 27.32

Calculated Energy Consumption: 148.31

Location Information

BAG Object ID: 0797010000055178

Building Detail Description: -