8531WW 19
(June 10, 2026)
General Information
Registration Date: June 10, 2026
Survey Date: June 10, 2026
Valid Until: June 10, 2036
Certificate Holder: In2Energie
Survey Type: Detailopname
Status: Vergunningsaanvraag/melding WKB
Calculation Type: NTA 8800:2025 (detailopname woningbouw)
Based on reference building: -
SBI Code: -
Project Name: -
Project Object: -
Building Information
Building Type: Twee-onder-ƩƩn-kap
Building Subtype: -
Building Class: W
Construction Year: 2026
Thermal Zone Area: 148.01 m2
Compactness: 1.75
Energy Performance
Energy Class: A+++
Energy Index: -
Energy Need: 61.89 kWh/m².yr (EP1)
Primary Fossil Energy: 26.32 kWh/m².yr (EP2)
Renewable Energy Share: 73.80 % (EP3)
Temperature Exceedance: -
Heat Demand: 45.47 kWh/m².yr
Energy Index (EMG Forfaitair): -
Primary Fossil Energy (EMG Forfaitair): None
Renewable Energy Share (EMG Forfaitair): -%
Energy Need Requirement: 62.40 kWh/m².yr (BENG1)
Primary Fossil Energy Requirement: 30.00 kWh/m².yr (BENG2)
Renewable Energy Share Requirement: 50.00 % (BENG3)
Temperature Exceedance Requirement: 1.20
Calculated CO2 Emission: 4.86
Calculated Energy Consumption: 26.32
Location Information
BAG Object ID: 1940010003280838
Building Detail Description: -