Warmoesstraat 48 1012JE Amsterdam
(July 23, 2025)
General Information
Registration Date: July 23, 2025
Survey Date: July 19, 2025
Valid Until: July 19, 2035
Certificate Holder: Duurzaam Energieloket
Survey Type: Basisopname
Status: Bestaand
Calculation Type: NTA 8800:2024 (basisopname utiliteitsbouw)
Based on reference building: -
SBI Code: -
Project Name: -
Project Object: -
Building Information
Building Type: -
Building Subtype: -
Building Class: U
Construction Year: 1665
Thermal Zone Area: 122.46 m2
Compactness: 0.33
Energy Performance
Energy Class: A+++
Energy Index: -
Energy Need: 71.87 kWh/m².yr (EP1)
Primary Fossil Energy: 94.01 kWh/m².yr (EP2)
Renewable Energy Share: 27.5 % (EP3)
Temperature Exceedance: -
Heat Demand: 49.18 kWh/m².yr
Energy Index (EMG Forfaitair): -
Primary Fossil Energy (EMG Forfaitair): None
Renewable Energy Share (EMG Forfaitair): -%
Energy Need Requirement: - kWh/m².yr (BENG1)
Primary Fossil Energy Requirement: - kWh/m².yr (BENG2)
Renewable Energy Share Requirement: - % (BENG3)
Temperature Exceedance Requirement: -
Calculated CO2 Emission: 22.04
Calculated Energy Consumption: 94.01
Location Information
BAG Object ID: 0363010012118668
Building Detail Description: -